Preparation before starting the complete set of rice milling equipment manufacturers: check whether the equipment in each part is normal and whether the connection is loose. Check whether the pulley of each machine is running flexibly, whether there is friction, and whether the round hole screen of the equipment is blocked. Check each intake and intake pipe for blockage, and whether the sluice is closed. Check the lubrication of each rotating component. After everything is normal, you can start. Pay attention to the first short-term dry run, when the equipment is running stably and everything is normal, you can start production and processing. The operation flow of the complete set of rice milling equipment manufacturer is as follows:
Complete sets of rice milling equipment manufacturersPreparation before starting up: check whether the equipment in each part is normal and whether the connection is loose. Check whether the pulley of each machine is running flexibly, whether there is friction, and whether the round hole screen of the equipment is blocked. Check each intake and intake pipe for blockage, and whether the sluice is closed. Check the lubrication of each rotating component. After everything is normal, you can start. Pay attention to the first short-term dry run, when the equipment is running stably and everything is normal, you can start production and processing. UseComplete sets of rice milling equipment manufacturersThe operation flow is as follows:
1. Processing flow: Add the accurately weighed original grain to the silo, start first, and then open the water-saving port of the feed port to operate quickly and practically, so that the accuracy of the finished product exceeds the regulations. The actual operation time is not more than 5 minutes. The finished product with lower accuracy at the beginning will be returned to the machine after the third sampling and all coarse grains will be cleaned.
2. Current, working voltage and speed ratio. Immediately after the start of the test, the current and operating voltage were measured every 5 minutes. After the test is normal, the speed ratio is measured twice for each test and recorded.
3. The use of time and electromagnetic energy. The entrance gates open and the countdown begins. The countdown is complete when all coarse grains are based on the water-saving port of the feed port. In addition, the initial and final readings of the single-phase meter record the relative time.
4. Mi Wen. Within 50 minutes after the start of the test, use some thermometers to measure the temperature of the coarse grains and measure the temperature of the finished product in the finished basket.
5. Rolling bearing temperature. At the beginning and end of the test, use some thermometers to measure the surface temperature of the rolling bearing housing.
6. Dust concentration standard. Measurements are made in the room. Ten minutes after the start of the test, use a dust sampler to select two measurement points within the subject activity range of the operators of the feeding station and chaff collection station for sampling, and measure the dust concentration standard.
7. Noise During the measurement process, the microphone height of the noise meter is 1m away from the surface of the equipment, and the aspect ratio of the road surface is 1.5m. Measure four points on the front, back, left and right.